Things Needed
Properly establish landscape edging should not be subject to ice upheaval , which causes lifting or buckling . The best method to repair icing - upheaved landscaping is to dig out the edging and substitute it . Consider replace cheap landscape painting edging with a high timbre edging that is less prone to ice upheaval once it has been the right way establish .
Step 1
Dig up dirt behind your edging with a spade and outflank shovel to break the entire back side of the edging .
Step 2
Pry out landscaping stake using a screw gadget driver . Lower caliber landscaping edging may not have been installed using stakes . landscape painting abut that has been installed using steel stakes is not as dependent to frost heave as abut that has just been immerse .
Step 3
Smooth and re - grade the trench behind your edging with a rake . The landscape painting abut deep should be uniformly 6 column inch deep . Cut any roots that you encounter with a brace of branch loppers .
Step 4
wind off in high spirits - quality commercial-grade landscaping edging and place it along the edges of your bed . Edging is sold in 20 base sections ; tie in section together using 8 - inch - retentive plastic connectors . Insert 4 in of the connector into one edge piece and the other 4 inch into the other piece . Do not accidentally push all 8 inches of the connecter into one piece of edging while essay to insert the other half into the second piece of edging ; this is a common error made by landscape gardener . Cut the edging so that it fit around the layer using a utility tongue .
Step 5
Press the edging up against the side of the landscape gardening bed so the pentad - shaped curl at the bottom faces inward . The roll at the top of the edging should not seat above the soil line . Only the top 1/3 of the bankroll should be seeable . Press the edging against the sharpness of the deep .
Step 6
enclose the brand stakes into the bottom of the edging just above the V - shaped curl . Space the stakes so that there are only four stakes per 20 feet of adjoin . Align the stakes parallel with the ground and forge them into the grunge .
Step 7
Pack soil down so that the edging is get across 1/3 of the way . Press the edging into the bulwark of the trench and stomp the soil to charge it around the vanadium - shaped gyre at the bottom of the edging . spit filth into any gap between the edging and the filth in front of it . Fill the oceanic abyss behind the edging with soil altogether . Water the soil to settle it in place and sum up more ground to occupy in any gaps .
References
Related
